Horizontal Stabilizer – Day 18 – 2 Hours

Today was pretty uneventful. I thought I would get some priming done but had a few errands come up. I got all the internal parts cleaned and they are all ready to be primed tomorrow. To prep, I “scrubbed” all the parts with water and a Scotch-Brite pad. Dried them and then went over them…

November 17, 2013 in Empennage, Horizontal Stabilizer.

Horizontal Stabilizer – Day 17 – 4 Hours

Today was a great day of progress on the plane. I finished de-burring the holes in the skins and dimpled the skins. I had a little time left so I de-burred the edges of the spar and skins as well. I’m so close to being able to rivet it all together. Tomorrow, I will, hopefully, get all…

November 16, 2013 in Empennage, Horizontal Stabilizer.

Horizontal Stabilizer – Day 16 – 2.5 Hours

Today, I finished up de-burring the holes in the skeleton and decided to start dimpling. Dimpling accomplishes the same thing as counter sinking except instead of cutting, we bend. So of course we use this process for thinner metal. I finished dimpling the skeleton today. I just have to de-burr and dimple the skins, de-burr all the edges…

November 13, 2013 in Empennage, Horizontal Stabilizer.

Horizontal Stabilizer – Day 15 – 1 Hour

Started de-burring all the holes in the skeleton. This is, pretty much, the most boring part of this project, but, absolutely necessary. After drilling, the holes have sharp edges that must be smoothed (Picture how easy aluminum foil is to rip…now imagine there’s an edge around a hole that thin. Cracks are most likely to…

November 12, 2013 in Empennage, Horizontal Stabilizer.

Horizontal Stabilizer – Day 14 – 2.5 Hours

Today I match drilled all the ribs to the new front spar for the left side, then attached the skin, match drilled the skin to the replacement front spar and match drilled the new rib. At this point, I am where I screwed up the left side before. Let’s see if I can successfully drill…

November 10, 2013 in Empennage, Horizontal Stabilizer.

Horizontal Stabilizer – Day 13 – 2.0 Hours

I decided to jump back over to the HS today and get to work forming the replacement reinforcement angle. I did a much better job this time around and am quite happy with the way it turned out. I cut the excess flange off the left front spar (which was also a replacement). Again, much…

November 6, 2013 in Empennage, Horizontal Stabilizer.

Vertical Stabilizer – Day 2 – 2 hours

Continued work on VS. Match drilled rib to spar attach holes and clecoed on the skin. Match drilled the skin to ribs. Now these are ready to be dimpled, de-burred, and primed for riveting.  

November 4, 2013 in Empennage, Vertical Stabilizer.

Vertical Stabilizer – Day 1 – 2 Hours

Today, I final drilled all holes in the rear spar and prepped the ribs (fluted, de-burred, and straightened the flanges). The VS is a cakewalk compared to the HS. All holes except two are already drilled and just need to be final drilled to size. I finished today with cleco-ing the skeleton together. I was quite…

November 3, 2013 in Empennage, Vertical Stabilizer.

Horizontal Stabilizer – Day 12 – 2.5 Hours

Finished bending and tapering the reinforcement angle. This time I managed to match drill the Aft Rib to Spar to Front rib quite nicely (i.e., where I screwed up the left side). After this, I final drilled all the holes in the skin and took it all apart. Now everything is ready to de-burr, dimple,…

November 2, 2013 in Empennage, Horizontal Stabilizer.

Horizontal Stabilizer – Day 11 – 1 Hour

Replacement parts arrived today. I did just a bit today. I got to work on tapering and bending the new reinforcement angle which attaches the two front spars together. This was all I needed to finish drilling the right side.

October 31, 2013 in Empennage, Horizontal Stabilizer.

Post navigation

← Older posts
Newer posts →

Recent Posts

  • Elevator – Day 20 – 1 hour
  • Elevator – Day 19 – 4 hours
  • Elevator – Day 18 – 2.5 hours
  • Elevator – Day 17 – 4 hours
  • Elevator – Day 16 – 2 hours

Recent Comments

Elevator – Day… on Horizontal Stabilizer –…
Dave's avatarDave on Wings Arrived Today

Archives

  • June 2015
  • February 2015
  • September 2014
  • July 2014
  • June 2014
  • May 2014
  • April 2014
  • March 2014
  • February 2014
  • January 2014
  • December 2013
  • November 2013
  • October 2013
  • September 2013
  • October 2012

Posts by Project Phase

Meta

  • Create account
  • Log in
  • Entries feed
  • Comments feed
  • WordPress.com

Other Builders

  • Bruce Swayze's RV-7A Project
  • Jason Hess's RV-7A
  • Mike Bullock's RV-7

Builder Resources

  • Van's Air Force
  • Van's Aircraft
Create a free website or blog at WordPress.com.
Ryan Van Liere's RV-7A Project Page
Blog at WordPress.com.
Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To find out more, including how to control cookies, see here: Cookie Policy
  • Subscribe Subscribed
    • Ryan Van Liere's RV-7A Project Page
    • Already have a WordPress.com account? Log in now.
    • Ryan Van Liere's RV-7A Project Page
    • Subscribe Subscribed
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...