Rudder #2 – Day 17 – 2 hours
Wrapped up the rudder today (except the fiberglass tips and bearings to connect to Vertical Stab). All that was left today was to roll leading edge skins. This was done by taking a 5′ steel 3/4″ pipe and duct taping it along the edge and rolling it. A lot of force is applied down and…